Monday, October 1, 2007

What Are The Largest Microwave Ovens

Preparing the ground for the laminate flooring wooden flooring

Surface preparation is very important especially when laying wood floors, due to the fact that it must stick to the ground. So when installing parquet or mosaic surface must be flat, durable, dusty and dry. When the panels while the situation is simplified enough to base a fair and dry. The substrate for the panels may be old flooring: inlaid wood flooring, terrazzo, ceramic tiles or PVC. The panels can also be arranged on a carpeted with short hair. It is then necessary to check there are no bulges in the carpet. If necessary, the parts must be glued. After this preparation we put panels, but without the foam backing. In this way we save on foam, but rather radzilibyƛmy breaking the old carpet and the use of primer.

In other substrates such as floors, mosaic or PVC foam backing, use and arrange the panels according to standard instructions. It should however be sure that the old parquet or mosaic are well cemented (if not, then you need to make glue). The raw

floors inequality can not exceed 3 mm. We check this by applying patch to the ground (straight board) with a length of 2.5 - 3 m and move it across the floor watching the scalp. If you need to use more weight inequalities leveling (description below). In the case of holes and cracks in the floor should be supplemented with mortar.

panels also can be placed on such a blind floor floor boards on joists. Boards must be stable and durable (not rotten). In this case we put panels across the board - perpendicular to them. It is best to first put a plate on the boards, such as plywood for stability. Plates and glue the bolts into the ground.

NOTE: Same panels may not be installed on joists, or without the foam.

Alignment
floor to floor about inequality around 5 mm can be compensated by using self-leveling. This is the simplest way to compensate for the floor. Mass self-leveling, as the name suggests, spreads itself across the floor leveling inequalities. First, the substrate must be cleaned of dust and pebbles. Then pour the liquid mass primer. It is a white liquid, which supports the adoption of mass. Self-leveling screed must be quite rare, but no such consistency as water. After preparing the spout should not be left longer than 10 minutes in a bucket. If the room is quite large, we can be divided into several parts with square timber, to have future access to the newly poured floor. Starting from the furthest faucet in relation to the door of the room. Pour the first batch of mass (of course, not before.) Unfortunately, you need a little help it - please spread the weight a little trowel that has disappeared into a separate covering the entire surface of the floor. It is do so with each separate section of the room. Holes in the planks on the floor, we can then make up the ground or cement mortar (if large). Before installing the panels have to wait about 48 hours (if the layer is too thick) to the floor was quite dry, the weight will change color to light gray and will not feel damp. Now we can see a patch of floor equality - should be simple.

When installing panels on newly poured floor radzilibyƛmy use foam insulation backing or with film.

Source: http://poradniki.dom.pl/?p2=1179&p3=1310&sekcja=Monta% BF & Tit = Przygotowanie_pod B3o%%% B3ogowe.html BFa_pod_panele_pod

0 comments:

Post a Comment